Manually unlocking ground is a crucial step for many outdoor development projects, both terraces, alleys or floors. This operation allows you to create a stable basis, to regularize surfaces and avoid drainage or settlement problems. In this article, we explore the proven methods, the essential tools and the suggestions for a successful job without errors.
Understand the importance of disbursement
The delivery consists in removing a layer of earth or materials to achieve a precise depth. This step is essential for:
- Create a flat base : Indispensable for positioning finishes, slabs or floors covering.
- Avoid inequalities : An accidental or inclined soil can compromise the stability of the structures.
- Prepare drainage : The correct disbursement allows you to install layers of gravel or sand to evacuate the water.
Material necessary for manual disbursement
Basic tools for manual disbursement
- Collector or shovel : To dig and move the earth to small surfaces.
- Strings and spikes : To delimit the area and check the levels.
- Level of spirit : Essential to control the horizontality of the soil.
- Wooden rule : Useful for regulating the layers of sand or gravel.
Complementary materials
- Geotassile : To stabilize the ground and avoid erosion.
- Sand and gravel : To form a drainage under a drainage.
- Vibrant plate or roller : To compact the materials.
Detailed steps for successful delivery

Preparation of the earth
- Border of the area : Plants for the curves to the corners and the ropes elongated to delimit the position.
- Level verification : Use a level of bubbles to ensure that the ropes are perfectly horizontal.
Excavation
- Adapted depth :
- For pebbles : Deliver to the height of the background (sand + gravel) plus the thickness of the flooring.
- For a cement plate : Dig at least 20 cm to install a stable basic level.
- Excavation technique :
- Small surfaces : Use a pickaxe or shovel.
- Large areas : Promote a rudder or a mini-piece.
Level verification
- Regular control : Check the depth at regular intervals with a rule or a meter.
- Adjustments : If necessary, add or remove the earth to reach the desired height.
Compaction
- Level method :
- Steps :
- Maximum layer : Spread the sand or gravel.
- Compaction : Use a vibrant plate or a roller to buff the materials.
- Repeat : Continue until you reach the total depth.
- Suggestions :
- Sprinkle slightly : To improve the grip of materials.
- Check the resistance : Test the floor while you walk – must resist without sinking.
Tips to optimize the delivery
Work in diapers
- Benefits :
- Precise control : Each level is compact before adding the next one, avoiding future clashes.
- Reduction of errors : Limit the risks of soil imbalance.
Use a geotesile
- Function :
- Stabilization : Prevents the mixture of layers of sand and gravel.
- Drainage : Allows an evacuation of optimal water.
Floor
«A good terrassier knows that the perfect decline is played for several weeks, not in one day. For clay soils, it plans a light bombed at the beginning, because they will necessarily be advertised over time.» «
Check the drainage
- Slight slope : Slightly tilt the ground towards a drainage point.
- Permeable layers : Favors gravel and sand to avoid puddles.
Practical cases: outlay for terrace, corridor or slab
Pebble
- Disbursement : Digs on a depth equal to the background (sand + gravel) plus the thickness of the purposes.
- Upside down : Distribute a mixture of sand and gravel, then enrich it with a vibrant plate.
- Positioning of pebbles : On a bed of fine sand, aligate the pebbles respecting the joints.
Vector
- Preparation :
- Foundation layer : Compact gravel to support the weight of vehicles.
- Minimum thickness : 15 cm of undercoat for a garage road.
Concrete slab
- Disbursement : Dig 20 cm to install a layer of gravel and thermal insulation.
- Cassorm : Use the wooden axes to delimit the slab.
- Casting : Pour the cement and smooth it with a ground of the bricklayer.
Manual disbursement is a demanding but rewarding operation, especially if performed rigorously. Following the key steps: limits, level excavation, systematic compaction – and by applying the tips of professionals, you will get a solid base for your projects. Both for a terrace, a path or slab, careful preparation guarantees the sustainability and aesthetics of your development.
latest posts published
Discover our furniture line in Cotia
Prepare your outdoor space for summer
Safety Tips – Construtora Agmar
Gourmet space in Agmar developments: by Cícera Gontijo
Easter in the condominium: 3 games to play with the children
Sophistication in your company: discover high-end office furniture
Yora Building, the most awaited building in Agmar
Pets in apartments: advice on how to raise them
Five tips for adding rugs to your decor